Post-cement screed floor.
Walls have been painted and the chalk board wall is sorted. All were pains takingly done by B and me over 2 back-breaking weekends. Things moved pretty quickly as we were quite on top of things, calling the foreman and the various people coordinating so that there’s progress every week, or everyother day.
24th Nov. Our floors were completed. The staff from Supreme. Kelvin, was the gold standards doing it double quick time. All done in 1 day, in fact from 9.30am to 5pm, to be exact. The next day, the 1st piece of art work by Conor Harrington and my study table came in. The house is looking like a home with every passing day.
6th Dec. The bed, glass cabinet, Muji sofa and 2 gorgeous chairs will be here. The Eames RAR rocker and the Prouve Standard chair will be in.
Norm 69 lamp and our self-designed table made from recycled Chengal wood in the common room.